Classic Antiques Product Gallery
For over a century, C.J. Anderson & Company has specialized in manufacturing and restoring authentic elevator fixtures with timeless character. Our Classic Antique product line features hand-cast brass plates, lever-activated stations, historically styled indicators, and specialty restoration services for projects that demand a higher level of craftsmanship.
Whether you're outfitting a historic building, upgrading a residential elevator, or recreating a long-retired fixture, our Classic Antique offerings can be tailored to match original aesthetics while meeting modern functionality.
Product Categories We Offer
Each item in our Classic Antique line is built-to-order and often fabricated using original molds from our company archives. Fixtures are poured, machined, and assembled one at a time to match your project's exact requirements.
Style #1 |
Style #2 |
Style #3 |
Style #4 |
Style #5 |
Style #5.5 |
Style #6 |
Style #7 |
Style #7.5 |
Style #8 |
Style #9 |
Style #10 |
Style #11 |
We are the original Classic, Antique Fixture manufacture as many of our patterns and casting designs date back to the 1910’s and 1920’s. We specialize in working with you to find a style and the features you require for your historic elevator. Looking for a classic antique elevator button panel to compliment your buildings character? Look no further, you found it.
Build & Price
Click to build & price a classic fixture.
Features
- Solid Cast Brass face plates 3/8” - 1/2” Thick
- Different Sized Patterns In Our Possession
- Built To Meet Elevator & ADA Codes
- We have many different sizes in our library of patterns
- Available in Car Stations, Hall Stations, Position Indicators
- Custom colors to match your building are available
Materials & Finish Options
- Brass
- Bronze
- Oil Rubbed Bronze
- Aluminum
Lead Times & Ordering Process
- Fixture Quote Turnaround Time: 24 Hours
- Fixture Drawings for Approval: 7–10 Days
- Fixture Lead Times: 8–12 Weeks*
- Expedited Lead Time Option: No*
*Expedited lead time options are not available for this product line. Lead times will be estimated and confirmed once drawings are received and the project is released into production. These times are approximate and depend on our foundry’s schedule and the scale of your project. Castings are poured one at a time, and each fixture is individually fabricated. If general lead times don't align with your project schedule, temporary fixtures may be installed to get your elevator operational while awaiting delivery of the cast fixtures.